Skip to content
Stefano Tommesani

  • Home
  • Programming
    • SIMD on x64/x86
    • Multi-thread
    • C# and .NET
    • Testing
  • Software
    • Sundial project tracking
    • AltaLux 3.0: choose what to enhance
  • Video
  • Marketing
  • About me
  • Home
  • Programming
    • SIMD on x64/x86
    • Multi-thread
    • C# and .NET
    • Testing
  • Software
    • Sundial project tracking
    • AltaLux 3.0: choose what to enhance
  • Video
  • Marketing
  • About me
  • Multi-thread - SIMD on x64/x86 - Software - Video

    AltaLux 3.0: choose what to enhance

    September 6, 2026

    AltaLux 3.0 brings optional AI object selection to IrfanView, reduces colored noise in lifted shadows, and adds a smoother, zoomable preview. Object selection runs locally on your CPU.

    Continue Reading
  • Programming - SDLC - Software

    From API dependencies to portfolios of Suppliers

    September 3, 2026

    The article discusses the strategic selection of API suppliers, comparing it to database choices. It emphasizes the value of employing multiple suppliers through adapters to enhance flexibility, cost-efficiency, and performance, rather than relying on a single provider. By measuring outcomes and dynamically routing requests, businesses can optimize their API integrations,…

    Continue Reading
  • Multi-thread - SIMD on x64/x86 - Testing - Video

    How benchmarks guided Codex to faster kernels in AltaLux V2

    September 1, 2026

    The AltaLux V2 plugin enhances image processing through a multi-layered approach using CLAHE, improving local contrast but requiring more computation. Optimization focused on kernel vectorization using SIMD, with benchmarks guiding performance. The process revealed limitations of SIMD in certain operations and transitioned from SSE2 to SSSE3 for efficiency, ensuring an…

    Continue Reading
  • Multi-thread - SIMD on x64/x86 - Software - Video

    AltaLux 2.0: a new multiscale engine and a simpler way to enhance images

    May 28, 2026

    AltaLux 2.0 replaces the old Intensity/Scale workflow with a three-layer multiscale enhancement engine, a large before/after preview, and controls that describe the look users actually want: Strength, Detail, and Natural look.

    Continue Reading
  • Mainframe
    Software - Web

    Terminal thinking

    May 16, 2026

    Disclaimer for technology predictions: they tend to age with the dignity of unrefrigerated milk, and this one may well do the same. Although, if it does, it will have to curdle around evidence that is already sitting in plain sight. Brian Chesky runs a $70 billion company, and in October…

    Continue Reading
  • Claude Shannon
    Programming - Video

    The evolution of entropy coding: from Huffman coding to ANS

    May 1, 2026

    When a compression format becomes well known, the entropy coder is rarely the part people remember: ZIP is usually described as “LZ77 plus Huffman”, but the LZ77 part gets most of the attention because it is easy to explain: find a repeated string and replace it with a reference to…

    Continue Reading
  • SDLC - Software

    Sundial Project Tracker

    April 5, 2026

    Sundial complements Jira. Jira handles day-to-day tracking: live status, collaboration, and sprint metrics such as burndown, velocity, and CFD. Sundial provides a scenario lab and reporting console. Its eight diagrams share one simulation model: GANTT, GANTT over time, WBS, WBS over time, Sunburst, Scope over time, Milestones over time, and…

    Continue Reading
  • Programming - SDLC - Software

    Day-by-day: forecasting project completion through work flow simulation

    January 25, 2026

    Introduction Project scheduling presents a fundamental challenge: given a set of tasks with varying durations, dependencies, and resource requirements, how can we predict when each task will complete? Traditional approaches often rely on static calculations that assume perfect conditions. The scheduler described in this article takes a different approach by…

    Continue Reading
  • Work Tracker diagram
    Programming - SDLC - Software

    Skills, or do we have the right developers?

    January 6, 2026

    In this third installment, we’ll analyze how the simulation estimates completion dates by tracking both the skills developers bring to the table and the skills required to execute groups of tasks. This matching process pinpoints which developers will be overburdened with work, and which ones will starve because not enough…

    Continue Reading
  • AltaLux example
    Multi-thread - SIMD on x64/x86 - Software - Video

    AltaLux 1.9.1.92: major update for performance, correctness, and documentation

    December 26, 2025

    Version 1.9.1.92 represents the most significant update to AltaLux since its initial release. This version brings critical bug fixes, substantial performance improvements, comprehensive documentation, and enhanced user experience. Critical Bug Fix: Color Preservation The Problem Previous versions used an incorrect algorithm for preserving color when applying luminance enhancements. The old…

    Continue Reading
 Older Posts

Recent Posts

  • AltaLux 3.0: choose what to enhance
  • From API dependencies to portfolios of Suppliers
  • How benchmarks guided Codex to faster kernels in AltaLux V2
  • AltaLux 2.0: a new multiscale engine and a simpler way to enhance images
  • Terminal thinking

Downloads

Icon
AltaLux v. 3.0.2 plugin for IrfanView – Segmentation add-on installer
0.00 KB 1 file(s)
Icon
AltaLux v. 3.0.2 plugin for IrfanView – Segmentation add-on
0.00 KB 1 file(s)
Icon
AltaLux v. 3.0.2 plugin for IrfanView - x86 version
0.24 KB 1 file(s)
Icon
AltaLux v. 3.0.2 plugin for IrfanView - x64 version
0.24 KB 1 file(s)
Icon
Vigilo 0.9.0
0.00 KB 1 file(s)

Vintage CPUs of the day

  • AMD K6-2 333 MHz AMD K6-2 333 MHz
  • Intel Pentium III 800EB Intel Pentium III 800EB
  • AMD Athlon 64 X2 4200+ AMD Athlon 64 X2 4200+
  • Intel Celeron 1000A Intel Celeron 1000A

Categories

  • Audio
  • C# and .NET
  • GPGPU
  • Marketing
  • Multi-thread
  • OOD / OOP
  • Programming
  • SDLC
  • SIMD on x64/x86
  • Software
  • Testing
  • Uncategorized
  • Various
  • Video
  • Web
  • Web
© 2026 Stefano Tommesani. All rights reserved.
Graceful Theme by Optima Themes