Glossary

Look up Sundial’s terms for effort, forecasts, snapshots, and staffing scenarios.

Read the plan with a shared vocabulary. Make project discussions more precise by using the same meaning for each term.
Term Meaning in Sundial
Baseline Saved snapshot used as the starting endpoint of a Delta comparison.
Current / Now Latest successfully processed current model; distinct from a saved checkpoint.
Delta Difference between a baseline and current model or later saved snapshot.
Effort Total declared work estimate, normalized to hours for presentation.
Spent Recorded effort already performed; the task form aggregates its baseline and entries.
Remaining effort Total effort minus spent effort, used for scheduling.
Forecast Deterministic simulated delivery under declared assumptions.
Initiative / Release Project-level grouping; history specifications use Release terminology.
Milestone Standalone commitment date with no work or dependency of its own.
Deadline / Goal Deliverable need-by date, shown as a reference or emphasized goal where applicable.
Reporting snapshot Dated Project-and-Team checkpoint for Delta/history charts, distinct from native startup snapshots.
Reporting start Date from which remaining work is simulated.
Draft Project, Team, or planning inputs not yet committed with Apply or the relevant confirmation.
Default capacity Daily available hours used on working days outside overrides.
Scheduled override Inclusive period whose daily hours replace the default; calendars still apply.
Work tracker Heatmap of simulated developer allocation, not a timesheet system.
What-if roster Alternative team assembled without editing the reference Team.
Native container The .sundial folder holding authoritative collaboration state and history.
Concurrent edit Independent changes made by separate browser instances before receiving each other's work.
Conflict Retained competing field values or edit/delete intentions requiring a decision.
Tombstone Recoverable native record of a deleted task, retaining its identity and history.
Workflow state Named, colored step in the project process, mapped to one simulation category.
Simulation category Backlog, In progress, Blocked, or Done scheduling behavior behind a detailed state.
Canceled outcome Terminal non-delivery retaining history, using no future capacity, and satisfying no dependencies.
Effective priority Explicit priority, nearest explicit ancestor priority, or Normal by default.
Manual order Preference among eligible unfinished leaves at the same effective priority.
Acceptance criteria Markdown description of observable completion conditions; not an executable completion gate.
Sprint scope Actionable work assigned to a sprint, independent of task status.
Sprint capacity Remaining estimated sprint effort compared with calendar hours, without developer speed or outside-sprint work.
Issue key Project prefix and allocated issue number, separate from native identity and hierarchy position.
Next states Allowed outgoing workflow destinations; an empty list is terminal.
Comment Append-only Markdown note with a stored UTC timestamp, persisted when the task draft is applied.
Sunburst over time Up to two historical Sunbursts beside Current, using one angular effort scale.
Milestones Scope mode Delivery date versus total estimated effort for each observation.

Put this into practice with the included example project.